MitsuStyle MitsuStyle

Go Back   MitsuStyle > The Homefront! > Project Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 09-26-2007   #11
scheides
flips McGee
 
scheides's Avatar
Re: Project Porting! Pics!

Install pics:











All buttoned up:






Thoughts/Review:

Well overall, install for all of this, including doing the porting was right around 3-3.5 hours. Not bad at all, and I would say performance wise this is a big bang-for-your-buck set of mods. Turbo spool-up is improved, midrange torque feels stronger, and top-end feels good. My test-drive was out in the rain, so I'll update this tomorrow after I more through test.

Last edited by scheides; 09-26-2007 at 11:02 PM..
scheides is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 04:22 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.